COE equipment is currently installed over the entire existing infrastructure of the MRT |
The Singapore MRT network has been in operation since 1987 and comprises 138Km of tracks over three lines. The Singaporean Government has allocated S$11.9m to O'Connor's to facilitate the improvement of the current infrastructure of the North-South and East-West lines, which form the majority of the MRT network. Combined with the integration of 4,300 new cameras to these lines, the extent and quality of surveillance throughout the 53 stations on these lines will be substantially increased. A key factor in the decision to utilise COE transmission equipment has been the ability to integrate new equipment whilst maintaining the existing network with no downtime. COE equipment is currently installed over the entire existing infrastructure of the MRT, with train borne equipment on the North-East line providing high quality transmission of live video from the first fully automated underground heavy rail system in Asia.
Mark Marriage, Chief Technical Officer of COE states: "The design of COE equipment and ease of integration across a common product matrix enables very easy expansion and development of an infrastructure, allowing maximum potential for further expansion at a highly competitive cost. We are proud O'Connor's has chosen COE for this project, and we are happy to be collaborating with them on the delivery of this complex transmission network."
The Singaporean Government has allocated S$11.9m to facilitate the improvement of the North-South and East-West lines |
Expanding security measures on the Singapore MRT network is an element of a major initiative by the Land Transport Authority (LTA) to improve the existing network whilst simultaneously planning and undertaking future developments. There are significant proposals to increase the size of the MRT network, with plans for a cumulative length of 278Km by 2020. The decision to use COE equipment for a significant upgrade to surveillance over the current lines reflects the continued enthusiasm to improve service throughout the network.